Real Numbers
What Roofing Contractors
Actually Recover.
These are representative results from real claims. Contractor names are withheld for privacy. The case-study numbers are not projections: they're what was approved by the carrier. Where a range is shown, it is a range across closed files, not a promise about any one claim.
~$4,000
Median recovery on claims already approved for full replacement, half landing between roughly $1,800 and $9,500
Next day
Average time from file to delivered supplement
25,000+
Estimates and supplements completed
In Depth
Case Study
Denied Roof Claim Overturned to Full Replacement
A carrier approved only a partial repair. Photo-documented, adjuster-language reporting moved it to a full replacement approval.
~$1,700 → ~$74,600
Read the full study →
Case Study
A Fully Approved Claim Still Left ~$405K on the Table
State Farm had already approved and paid the claim. A line-by-line comb-through found legitimate scope left off the original estimate.
~$405,000 recovered
Read the full study →
Showcase
Eleven Buildings, Four Estimates, Three Days
A multi-building Illinois complex needed carrier-ready numbers across TPO, metal, and shingle structures before any claim work could move.
$6M+ estimate-only project
Read the full study →
Residential Hail · Supplement
South Carolina Roofing Contractor
Carrier paid
$13,847.22
After supplement
$17,691.04
Recovered
+$3,843.82
Carrier missed starter strip on eaves and rakes, used incorrect waste factor, and omitted the high-profile ridge cap upgrade. Corrected quantities pulled from EagleView. Supplement approved without pushback.
Wind Damage · Residential Supplement
Georgia Roofing Contractor
Carrier paid
$16,412.58
After supplement
$23,189.73
Recovered
+$6,777.15
Step flashing, ice & water shield in valleys, and drip edge were all missing or underquantified in the original scope. Supplement submitted with full documentation and approved within two weeks.
Hail Damage · Residential Supplement
North Carolina Roofing Contractor
Carrier paid
$12,083.41
After supplement
$16,934.67
Recovered
+$4,851.26
Original scope omitted starter strip on rakes, used the wrong shingle quantity, and missed the steep charge on an 8/12 pitch. Straightforward supplement, no dispute required.
Storm Damage · Supplement with Gutters
Utah Roofing Contractor
Carrier paid
$19,217.88
After supplement
$24,461.53
Recovered
+$5,243.65
Gutters and downspouts were left off the scope entirely despite visible storm damage. Fascia damage documented and added. Full gutter system included and approved.
Hail & Wind · Residential Supplement
Hawaii Roofing Contractor
Carrier paid
$21,774.30
After supplement
$29,312.91
Recovered
+$7,538.61
Flashing items were missing throughout. Dumpster size was undersized for the scope. Island material pricing adjustments applied. Supplement approved on first submission.
Denied Roof Claim · Full Overturn
South Carolina Roofing Contractor
Carrier paid
$0.00 (denied)
After supplement
$20,844.17
Recovered
+$20,844.17
Carrier denied the roof as maintenance-related. We documented storm causation with photo timeline, satellite imagery, and a detailed scope. Adjuster reversed the denial on re-inspection. Full replacement approved.
Partial Scope · Overturn to Full Replacement
Georgia Roofing Contractor
Carrier paid
$5,618.44 (partial)
After supplement
$24,071.29
Recovered
+$18,452.85
Carrier approved only three squares of spot repairs. We submitted a supplement with full EagleView measurements and documented matching requirement under Georgia code. Full replacement approved after one round of carrier follow-up.
Results vary by claim, carrier, damage type, and documentation. These examples reflect actual approved outcomes but are not a guarantee of specific recovery amounts. Every claim is different.
Promise one: the fee
The standard fee is 15 percent of supplemental recovery. If a file produces no additional approved recovery, you pay nothing on that claim. That is the whole fee structure, and it applies claim by claim.
Promise two: the guarantee
Send us an average of 2 claims per week for 12 months. If that volume does not produce a minimum of six figures in additional margin for your company, we write you a $5,000 check at the end of the 12 months. The volume, the 12 months term, the six figure threshold, and the $5,000 figure are one set of terms and they always travel together.
This is a commitment we make, not a measured result. It is not a projection of what any contractor has recovered.
See what's on the table for your next claim.
Send us one claim. We'll write the supplement free. You see the numbers before you commit to anything.
Get My Free Supplement →No contract. No obligation. Just results.